Tennessee
QAP scoring guide.
Tennessee Housing Development Agency (THDA) · 2026 QAP
Competitive scoring
Real 2026 award data (THDA "2026 Competitive LIHTC Awards," updated 7/7/2026): New Construction General Priority winners scored a uniform 94.0000 across all 6 regional pools (West TN, Middle TN, Southeast TN, East TN, Northeast TN, Rural/Balance of State) — i.e., essentially the practical ceiling under the ~95-point achievable cap. Existing Multifamily Housing (Rehabilitation) winners scored 83.2195-85.0598 (5 awardees) against a 60-point minimum and ~93-point achievable ceiling. PHA General Priority Category winners scored 72.0000 and 80.0000 (min. 52 required). The sole Permanent Supportive Housing for Homeless Set-Aside awardee scored 63.8935 (single applicant, not a competitive threshold in that narrow pool).
Select a category to read its scoring criteria.
01New Construction: Housing Credit Development Location
4 pts
02New Construction: Meeting Housing Needs
6 pts
03New Construction: Development Characteristics
23 pts
04New Construction: Sponsor Characteristics
7 pts
05New Construction: Water & Sewer
4 pts
06New Construction: Financial Readiness to Proceed
4 pts
07New Construction: Design Development
4 pts
08New Construction: Planning & Zoning Process
4 pts
09New Construction: Public Housing Waiting List / HCV Holder Preference
1 pts
10New Construction: Serving Special Housing Needs OR Children
5 pts
11New Construction: Eventual Resident Ownership
1 pts
12New Construction: Energy Efficiency
10 pts
13New Construction: Tennessee Growth Policy Act
5 pts
14New Construction: Waiver of Qualified Contract Process
9 pts
15New Construction: Extended Recapitalization Waiver
8 pts
16Rehabilitation: Housing Credit Development Location
2 pts
17Rehabilitation: Meeting Housing Needs
13 pts
18Rehabilitation: Development Characteristics
23 pts
19Rehabilitation: Sponsor Characteristics
10 pts
20Rehabilitation: Serving Special Housing Needs
7 pts
21Rehabilitation: Public Housing Waiting List / HCV Holder Preference
1 pts
22Rehabilitation: Serving Resident Populations with Children
7 pts
23Rehabilitation: Eventual Resident Ownership
4 pts
24Rehabilitation: Energy Efficiency
10 pts
25Rehabilitation: Tennessee Growth Policy Act
5 pts
26Rehabilitation: Waiver of Qualified Contract Process
10 pts
27Rehabilitation: Extended Recapitalization Waiver
8 pts
2026 QAP (THDA), Board-approved 9/23/25, Governor-approved 12/17/25, Section 17 "Initial Application Scoring": Part A "New Construction Only" (document pages 49-56) and Part B "Rehabilitation of Existing Multifamily Housing" (pages 57-63). Minimum eligible scores (65 pts New Construction / 60 pts Rehabilitation, PHA General Priority Category 52 pts) stated in the Section 17.A and 17.B introductory paragraphs, which also state neither track is "intended to allow an Applicant to claim the maximum 100 points." Final ranking order and tie-breakers in Section 19.E and 19.F (both p.67); set-aside/priority-category rules in Sections 11-16 (pp.41-48).
Tie-breakers
Review the agency’s tie-breaker rules alongside the scoring criteria.
- New Construction: priority to the application requesting the least Housing Credit per unit
- New Construction, if still tied: priority to the development located wholly within a QCT and covered by a CCRP
- Rehabilitation (Existing Multifamily Housing): priority to the application requesting the least Housing Credit per unit -- this track has no secondary QCT/CCRP fallback
Underwriting parameters
2026 QAP (THDA, approved by Governor 12/17/2025), Section 6.B.3-4 "Financial Feasibility"/"Financial Pro-forma" threshold requirements (p.44); Section 11.F-J "Total Development Costs," "Developer Fees and Consultant Fees Limits," "Limit on Contractor Fees" (pp.74-77); Section 22.C-E "Total Development Cost Limits" and contractor fee limits for MTBA/noncompetitive deals (pp.134-136). THDA does not publish a standalone "Underwriting Standards" section or appendix in the QAP. The typical numeric underwriting inputs (vacancy, DCR, reserves, expense escalation) were also checked against THDA's companion documents — 2026 Market Study Guidance, 2026 Appraisal Guidance, and 2026 Physical Needs Assessment Guidance (all on the THOMAS Documents Page, thda.org/rental-housing-partn/thomas-documents) — and are not fixed there either; THDA instead evaluates feasibility case-by-case "as determined by THDA, in its sole discretion."
Utility allowance
Preferred method: local_pha
THDA County-Based Utility Allowance Schedules (calculated via the HUD Utility Schedule Model where THDA is the local PHA), plus the "2025 Utility Allowance Methodology" and "2025 Instructions for Utility Allowances" documents ↗2026 QAP, Part I, Section 10.M "Determination of Utility Allowance" (THDA LIHTC QAP pp. 63-68)
