Puerto Rico
QAP scoring guide.
Puerto Rico Housing Finance Authority (PRHFA / Autoridad para el Financiamiento de la Vivienda de Puerto Rico, AFV) · 2025 QAP
Competitive scoring
Not stated. The QAP does not publish historical winning scores or recent award data; only the 30-point minimum threshold is specified.
Select a category to read its scoring criteria.
01I.1 Location
17 pts
02I.2 Proximity to Amenities
8 pts
03I.3 Undesirable Activities (deduction)
-5 (deduction) pts
04II.1 Infill or Nuisance Abatement
2 pts
05II.2 Historic Property
3 pts
06II.3 Adaptive Reuse
3 pts
07II.4 Site Characteristics
6 pts
08II.5 Building Characteristics
10 pts
09II.6 Gap Financing Efficiency
10 pts
10II.7 Construction Readiness
5 pts
11III.1 Targeted Units
3 pts
12III.2 Preservation
4 pts
13III.3 Term
2 pts
14III.4 Homeownership Conversion
1 pts
15III.5 PHA Waiting Lists
1 pts
16IV.1 Developer Track Record
8 pts
17V.1 Funds Leveraging
2 pts
18V.2 Local Government Funding
3 pts
19V.3 Local Government Land/Building
3 pts
20V.4 PRHFA Financing
3 pts
21V.5 Intermediary Costs
3 pts
22VI.1 Supportive Services
3 pts
Puerto Rico 2025 Qualified Allocation Plan, Section 5.4 "Project Evaluation and Selection (Point Ranking System)," specifically 5.4.2 "Point Scoring Criteria" (pp. 33–44), with tie-breakers as Category VII (p. 44) and the 30-point minimum stated in Section 5.4.1 (p. 30). Source PDF: https://www.afv.pr.gov/wp-content/uploads/2025/10/qap25.pdf
Tie-breakers
Review the agency’s tie-breaker rules alongside the scoring criteria.
- Project that is readiest to proceed
- Lowest total development cost per unit
- Located in municipality with longest period since a Tax Credit allocation
Underwriting parameters
Puerto Rico 2025 Qualified Allocation Plan (PRHFA, approved Oct. 24, 2025), Section 5.2.3 "Underwriting Parameters" (pp. 27–28) for vacancy/escalation/DSCR/reserves/profit-cap/tax-credit-percentage/equity pricing; Section 5.2.2 "Allowable Costs and Expenses" (pp. 24–26) for developer fee and contractor fee caps; Section 5.3 "Underwriting and Financial Feasibility Analysis" (pp. 29–30) for the credit-sizing methodology; Section 9 "Projects Financed with Tax-Exempt Obligations" (pp. 52–53) for the 50%/25% bond test; Section 11 "Fees" (pp. 54–55) for the fee schedule; and the Foreword, "Available Funding" (p. vi) for the credit ceiling. Source PDF: https://www.afv.pr.gov/wp-content/uploads/2025/10/qap25.pdf
Utility allowance
Preferred method: not specified
2025-QAP §10.1 (incorporating Annex O by reference) → PRHFA Compliance Monitoring Plan, Annex O (Revised July 2016), Section E "Utility Allowance," pp. 31-35, plus Utility Allowance Certification Form PRHFA-12