Skip to content
State LIHTC research

New Hampshire
QAP scoring guide.

New Hampshire Housing (formerly New Hampshire Housing Finance Authority, NHHFA) · 2027-2028 (effective March 16, 2026) QAP

Browse all states ↗
● Verified guideChecked Sep 12, 2026View source QAP ↗
The point table

Competitive scoring

20 categories

2026 9% round: eight applications were scored from 107 to 145 points, but only six appear in the published reservation list. Those six scored 117, 121, 125, 127, 134 and 145; Trailside had the lowest listed reservation score, 117. Warner Workforce Housing (113) and Rockland Park Apartments (107) are scored applications, not verified awardees in that reservation source. Scoring alone does not establish an award. These historical results under the 2025-2026 QAP are not a winning-score forecast for the 2027-2028 cycle. Reviewed September 30, 2026 against NH Housing: https://www.nhhousing.org/wp-content/uploads/2026/05/2026-LIHTC-Final-Scores-by-Category.pdf and https://www.nhhousing.org/wp-content/uploads/2026/05/Current-LIHTC-Reservations.pdf.

Select a category to read its criteria.

01

1. General Occupancy Units

10 pts
General-occupancy (non age-restricted) projects with at least 25% of total units having 2+ bedrooms.
02

2. Income Targeting

23 pts
Sub-parts: (a) +5 if ≥20% of units ≤50% AMI; (b) +8 if 10-99% of units ≤30% AMI (also counts toward (a)'s calc); (c) +2 for committing 10% of units as non-LIHTC/market-rate; (d) +8 for electing the Average Income Test set-aside (≥40% of units LIHTC, average LIHTC income band ≤60% AMI).
03

3. Supportive Housing

15 pts
Mutually exclusive (score only one): (a) 15 pts – general-occupancy projects serving ONLY homeless/veteran households, with mandatory contracted third-party supportive services; or (b) 10 pts – any project type reserving 10-25% of units for households with a member who is disabled, a veteran, or homeless, with a contracted service provider.
04

4. Service Enriched Housing for Age-Restricted Units

5 pts
Contracting a VNA/homecare agency to provide free onsite health clinics for residents for a minimum of 10 years.
05

5. Community-Based Supportive Housing – 811 PRA (existing rental property)

2 pts
General-occupancy only. Committing 10% (or 2 units, whichever is greater) of an existing property's units to the Section 811 Project Rental Assistance program.
06

6. Community-Based Supported Housing – 811 PRA (new construction)

5 pts
General-occupancy only. Committing 10% (or 2 units, whichever is greater) of new units to the Section 811 PRA program.
07

7. Location

15 pts
Mutually exclusive: (a) 15 pts – project in a city/town with no other previously-approved affordable general-occupancy housing; or (b) 0-8 pts – score from the NH Housing Opportunity Index, summed across its Education/Health/Prosperity/Housing sub-indicators.
08

8. Project Grants and Assistance

51 pts
(a, up to 15, pick one) new rental-assistance subsidy for ≥50% of units/5+ yrs = 15; new PBV commitment for 20% of units/5+ yrs = 6; RAD conversion with long-term PBRA = 3. (b, stackable, up to 36) proposed long-term funding sources (HTC equity, land donation, CDBG, AHP, RD, grants, other long-term/sponsor loans) tiered by $/unit – proposed: 22/17/12/7/0 pts for >$29,999, $20-29,999, $10-19,999, $5-9,999, <$5,000 per unit; PLUS an additional 14/12/10/8/0 pts at the same $/unit tiers if the funding is firmly committed (not just proposed).
09

9. Advanced Projects

18 pts
(a, up to ~5) advanced Phase 1 Environmental / Historic Project Review progress; PLUS mutually exclusive (b or c): (b) 5 pts – prior phase of a phased project already LIHTC-approved and ≥50% leased; or (c) 10 pts – 4% and 9% phases developed concurrently ("twinned"), 4% phase ≥55 units.
10

10. Community Development Component

21 pts
(a, up to 10, pick one path) location in a Community Center Area, OR meets a Walkscore threshold (with transit/utilities), OR Smart Growth components (public water 3 / public sewer 3 / zoning w/o variance 2 / sidewalks 2, summed up to 10); PLUS, only if scored in (a): (b) +3 for QCT + Concerted Community Revitalization Plan; (c) +1 for preserving/renovating existing housing; (d) +5 for preservation/restoration of a historic building using Historic Tax Credits; (e) +2 for location in a federal Opportunity Zone.
11

11. Project Cost (TDC Weighted Average)

0 pts
Negative-points-only cost-control penalty (not a positive category). Deducts roughly -2 to -20 points depending on how far a project's TDC Weighted Average exceeds the current round's average (5%/10%/25% over, scaled further by whether the project qualifies for high-cost-standard exceptions). Preservation/recapitalization projects are exempt.
12

12. Sponsor is a PHA or CHDO

4 pts
Sponsor (or GP/managing member) is a Public Housing Authority or an NH Housing-approved Community Housing Development Organization.
13

13. Management Experience

10 pts
0-10 points scored via the point structure in NH Housing's Management Agent Questionnaire, based on the proposed management agent's experience and performance.
14

14. Developer/Sponsor Track Record

0 pts
Negative-points-only categories: (a) -1 to -20 for outstanding NH Housing obligations, non-compliance history (NH or other state HFAs), or previously returned/unused credit awards; (b) TBD penalty (equal to the prior category's point value) for failing to fulfill a scoring commitment made in an earlier application round; (c) -5 for having pursued a qualified contract in NH within the last 5 years.
15

15. Property Amenities

14 pts
(a) up to 12 pts total (capped regardless of how many are included) for on-site community amenities meeting minimum-size specs – community room, patio, community garden, secure unit storage, picnic area, service-coordination office, bike racks; (b) +2 for free password-protected WiFi in community rooms.
16

16. Energy Efficient Design and Construction

4 pts
(a) +2 for central air conditioning throughout all units and community rooms; (b) +2 for Passive House Certification, or a HERS score of 47 or better (24 or better if also including solar).
17

17. Renewable Energy

2 pts
Commitment to solar electric array(s) meeting roof-space-maximization criteria, or geothermal heating/cooling with a payback period of 7 years or less.
18

18. Design and Construction (Accessibility)

4 pts
Mutually exclusive by project type: (a) +2 for new-construction projects designing ≥15% of units as fully accessible (ICC/ANSI A117.1 Type A); or (b) +1 for rehab/preservation projects designing ≥10% of units fully accessible; PLUS (c) +2 for including 3+ universal-design features from a specified list.
19

19. Affordability Period

3 pts
Commitment to a 75-year LIHTC extended-use/LURA affordability period (beyond the standard 15/30-year compliance/extended-use structure).
20

Preservation Scoring Matrix (Appendix J) – preservation/recapitalization projects only

40 (structural ceiling if all 6 rows hit Tier 1; NH Housing states 8 as the MINIMUM eligibility threshold to qualify as a preservation project, not the matrix maximum) pts
Additional points layered ON TOP of categories 1-19 for preservation/recapitalization applications only (at least 8 of these points are required toward the 110-point preservation minimum). Top-tier categories (max 8/4/2 pts each): Expiring Affordability Covenants/Risk of Market Conversion; Project-Based Rental Assistance coverage. Second-tier categories (max 6/3/1 pts each): Risk of Loss due to Physical Condition; Risk of Loss due to Financial Viability; Unique Acquisition Opportunity; Leveraged Funds ($/unit tiered). Also used as the preservation-project tiebreaker.
Scoring source

NH Housing 2027-2028 Qualified Allocation Plan (HFA 109, effective March 16, 2026) — https://www.nhhousing.org/wp-content/uploads/2026/05/2027-2028-Qualified-Allocation-Plan.pdf — HFA 109.07 "Scoring and Tiebreakers," p.17-34 (Scoring Criteria table at A, Tiebreakers at B, plus a preservation-specific tiebreaker at HFA 109.04.D); minimum scoring thresholds at HFA 109.06.N, p.16 (this section also states 8 points from the Preservation Scoring Matrix as the MINIMUM to qualify as a preservation project -- not the matrix's maximum); Preservation Scoring Matrix at Appendix J, p.60-61 (6 independently-scorable rows, no stated cap on combining them). Historical results cross-checked against NH Housing's published "2026 LIHTC Final Scores by Category" -- note that document scores the PRIOR (2025-2026) QAP cycle, useful as corroborating evidence but not a 1:1 validation of the current cycle's numbers (at least one category, old 9.d Site Plan Approval, moved from scored to a mandatory threshold item in this QAP).

When scores are close

Tie-breakers

Review the agency’s tie-breaker rules alongside the scoring criteria.

  1. Greatest number of net new housing units is favored
  2. If still tied, lowest amount of LIHTCs per rent-restricted unit (most efficient use of LIHTCs) is favored
  3. For preservation-project ties specifically (HFA 109.04.D): the project with the most points from the Preservation Scoring Matrix (Appendix J) is favored
Model assumptions

Underwriting parameters

NH Housing "Underwriting Standards and Development Policies for Multifamily Finance" (effective 7/10/2024) — Part 5 "Underwriting Requirements," §5.02 Sources of Funds/Developer Fee (p.9-11), §5.03 Income/Operating Expenses incl. Vacancy Rates and Trending (p.12-14), §5.04 Pro Forma/DCR (p.14-15), §5.05 Development Budgets/Reserves (p.15-17), §5.06 Third Party Reports (p.18-20); plus Attachment B "25% Test Policy" and the NH Housing Fee Schedule for Multifamily Housing (Feb. 2026). Companion to QAP HFA 109 (2027-2028 QAP, eff. March 16, 2026), cross-referenced at HFA 109.04.E (Developer Fee), 109.06.B/G (Feasibility & Cost Reasonableness thresholds). All hosted at nhhousing.org/developer-financing/underwriting-development/.

Operating assumptions

Utility allowance

Preferred method: local_pha

LIHTC Utility Analysis Grid (Agency Estimate submission template, not a self-serve calculator) ↗

NH Housing, "LIHTC Utility Allowances" policy (rev. Dec. 23, 2020), section "Applicable Utility Allowances," items 1-4(a-f). The 2027-2028 QAP itself (HFA 109, eff. March 16, 2026) contains no dedicated utility-allowance methodology section; it only references utility allowances in passing (investment-limit adjustment language, p.9, and the Appendix I recordkeeping requirement under Treas. Reg. §1.42-5(b), p.54).

Your next steps

Development guides for New Hampshire

Use the LIHTC feasibility checklist →